IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0487 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $100 Implemented
GT0487 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $775 $850 Implemented
GT0487 # 06 Y:1993 06 1993 REPLACE BOILER $6,960 $16,500 Not Implemented
GT0487 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,982 $7,000 Implemented
GT0487 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,940 $0 Implemented
GT0487 # 09 Y:1993 09 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,530 $1,000 Implemented
GT0487 # 10 Y:1993 10 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $790 $0 Implemented
GT0464 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $10,600 Not Implemented
GT0464 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $6,000 Not Implemented
GT0464 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $247 $375 Not Implemented
GT0464 # 04 Y:1992 04 1992 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $256 $300 Not Implemented
GT0464 # 05 Y:1992 05 1992 REPLACE BOILER $8,120 $18,000 Not Implemented
GT0464 # 06 Y:1992 06 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,680 $23,500 Not Implemented
GT0416 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,450 $150 Not Implemented
GT0416 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,055 $400 Implemented
GT0416 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,340 $10,650 Implemented
GT0416 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $30,000 Implemented
GT0416 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $558 $1,740 Implemented
GT0416 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,060 $0 Implemented
GT0416 # 07 Y:1990 07 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $1,380 $0 Implemented
GT0416 # 08 Y:1990 08 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,150 $1,530 Not Implemented
GT0416 # 09 Y:1990 09 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $780 $1,000 Not Implemented
GT0370 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,594 $3,680 Implemented
GT0370 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,724 $1,820 Implemented
GT0370 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $287 $0 Implemented