IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0355 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $300 Implemented
GT0355 # 01 Y:1988 01 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,437 $7,830 Not Implemented
GT0355 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $702 $85 Implemented
GT0355 # 04 Y:1988 04 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $136 $140 Not Implemented
GT0355 # 05 Y:1988 05 1988 USE RADIANT HEATER FOR SPOT HEATING $11,594 $25,480 Implemented
GT0344 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $140 $0 Not Implemented
GT0351 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $600 $0 Not Implemented
GT0344 # 04 Y:1988 04 1988 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $90 $35 Not Implemented
GT0344 # 03 Y:1988 03 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,230 $2,600 Not Implemented
GT0344 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,970 $2,830 Not Implemented
GT0344 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $37,911 $21,000 Not Implemented
GT0344 # 06 Y:1988 06 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,280 $1,200 Not Implemented
GT0344 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,772 $8,751 Not Implemented
GT0344 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $725 $5,250 Not Implemented
GT0351 # 06 Y:1988 06 1988 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $690 $300 Not Implemented
GT0351 # 05 Y:1988 05 1988 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,560 $4,190 Not Implemented
GT0351 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $920 $540 Not Implemented
GT0351 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36 $25 Not Implemented
GT0351 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $373 $2,000 Not Implemented
GT0340 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,410 $1,640 Implemented
GT0340 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,580 $1,000 Implemented
GT0340 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $320 $160 Implemented
GT0340 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,790 $12,930 Not Implemented
GT0340 # 05 Y:1988 05 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $1,800 Implemented
GT0340 # 06 Y:1988 06 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $213 $237 Implemented