IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0919 # 01 Y:2018 01 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $21,617 $400 Not Implemented
GT0919 # 06 Y:2018 06 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $90,950 $1,944,000 Implemented
GT0919 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,773 $8,000 Implemented
GT0919 # 05 Y:2018 05 2018 USE SOLAR HEAT FOR HEAT $41,493 $850,000 Not Implemented
GT0919 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,045 $18,576 Implemented
GT0919 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,910 $55,885 Not Implemented
GT0918 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $232 $1,000 Implemented
GT0918 # 05 Y:2018 05 2018 USE OPTIMUM TEMPERATURE $8,768 $23,162 Not Implemented
GT0918 # 04 Y:2018 04 2018 AVOID FROST FORMATION ON EVAPORATORS $47,297 $90,000 Not Implemented
GT0918 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,373 $5,449 Implemented
GT0918 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,414 $3,500 Implemented
GT0918 # 01 Y:2018 01 2018 PAY BILLS ON TIME TO AVOID LATE FEES $3,016 $1,488 Implemented
GT0918 # 07 Y:2018 07 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $2,630 $13,862 Not Implemented
GT0917 # 05 Y:2018 05 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $16,833 $137,000 Not Implemented
GT0917 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $311 $912 Not Implemented
GT0917 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $20,126 $10,000 Not Implemented
GT0917 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,834 $10,400 Implemented
GT0917 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,029 $18,819 Not Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0916 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,406 $38,834 Implemented
GT0916 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $12,211 $1,242 Not Implemented
GT0916 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,215 $10,400 Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0916 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $41,023 $3,991 Not Implemented
GT0916 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $5,518 $200 Not Implemented