IAC logo
IAC Assessment: GT0919
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0919
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2018
Principal Product Reclaimed water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 59
Plant Area (Sq.Ft.) 83,000
Annual Production 2,555 Units
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $818,645 13,940,194 kWh $0.06
TOTAL ENERGY COSTS $818,645
RECOMMENDED SAVINGS* $241,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $166,768
#|Description Savings
Cost
Status Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost
$ kWh $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$21,617
Cost:
$400
- - $21,617 - -
-
kWh
$21,617
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$67,773
Cost:
$8,000
$67,773 1,148,706 - - $67,773
1,148,706
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,045
Cost:
$18,576
$8,045 136,358 - - $8,045
136,358
kWh
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,910
Cost:
$55,885
$11,910 201,873 - - $11,910
201,873
kWh
-
-
$
05: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$41,493
Cost:
$850,000
$41,493 705,498 - - $41,493
705,498
kWh
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$90,950
Cost:
$1,944,000
$90,950 1,541,524 - - $90,950
1,541,524
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$241,788
Cost:
$2,876,861
$220,171 3,733,960 $21,617 - $220,171
3,733,960
kWh
$21,617
-
$
TOTAL IMPLEMENTED Savings:
$166,768
Cost:
$1,970,576
$166,768 2,826,589 - - $166,768
2,826,589
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost