Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,342
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0106 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,899 | $2,000 | n/a |
NL0106 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $398 | $100 | n/a |
NL0106 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,713 | $5,826 | n/a |
NL0106 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,202 | $125 | n/a |
NL0106 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,863 | $25 | n/a |
NL0106 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $303 | n/a |
NL0106 # 04 Y:2024 | 04 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,086 | $675 | n/a |
MZ0369 # 07 Y:2025 | 07 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,940 | $870 | n/a |
MZ0369 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,599 | $7,900 | n/a |
MZ0369 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,987 | $1,000 | n/a |
MZ0369 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $62,544 | $926,250 | n/a |
MZ0369 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $23,108 | $9,760 | n/a |
MZ0369 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,668 | $35,570 | n/a |
MZ0369 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,842 | $16,170 | n/a |
NL0101 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,125 | $8,785 | n/a |
NL0101 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,117 | $315 | n/a |
NL0101 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $265 | $1,404 | n/a |
NL0101 # 04 Y:2024 | 04 | 2024 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,520 | $1,700 | n/a |
NL0101 # 02 Y:2024 | 02 | 2024 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $8,730 | $7,424 | n/a |
NL0101 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $670 | $175 | n/a |
NL0101 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,849 | $7,210 | n/a |
MZ0366 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,343 | $2,297,063 | n/a |
MZ0366 # 01 Y:2024 | 01 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,410 | $168,000 | n/a |
MZ0366 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,674 | $14,000 | n/a |
MZ0366 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,668 | $59,968 | n/a |