IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0432 # 11 Y:2008 11 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,042 $930 Not Implemented
IA0432 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,529 $1,781 Not Implemented
IA0432 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $571 $1,650 Implemented
IA0432 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $16,295 $3,442 Not Implemented
IA0432 # 07 Y:2008 07 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $423 $143 Implemented
IA0432 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $322 Implemented
IA0432 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $979 $17 Implemented
IA0432 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $67 Not Implemented
IA0432 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,859 $620 Implemented
IA0432 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,099 $1,884 Implemented
IA0412 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $2,775 Implemented
IA0412 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $164 $200 Implemented
IA0412 # 04 Y:2007 04 2007 COVER OPEN TANKS $143,500 $22,000 Implemented
IA0412 # 09 Y:2007 09 2007 REDUCE SCRAP PRODUCTION $33,433 $4,000 Not Implemented
IA0412 # 08 Y:2007 08 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $6,996 $500 Not Implemented
IA0412 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $671 $1,925 Not Implemented
IA0412 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,810 $1,864 Implemented
IA0412 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,034 $500 Implemented
IA0412 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,880 $104 Implemented
IA0331 # 14 Y:2003 14 2003 COVER OPEN TANKS $1,451 $4,500 Not Implemented
IA0331 # 13 Y:2003 13 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,530 $12,000 Not Implemented
IA0331 # 12 Y:2003 12 2003 $200,000 $200,000 Not Implemented
IA0331 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $1,491 $3,352 Not Implemented
IA0331 # 10 Y:2003 10 2003 $8,977 $10,800 Not Implemented
IA0331 # 09 Y:2003 09 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $34,789 $29,757 Not Implemented