IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2007
Principal Product Aluminum Castings
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales $1,000,000-$5,000,000
# of Employees 81
Plant Area (Sq.Ft.) 100,000
Annual Production 3,200,000 Pounds
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,031 4,275,900 kWh $0.04
Electricity Demand $111,786 11,316 kW-months/year $9.88
Natural Gas $436,879 55,163 MMBtu $7.92
TOTAL ENERGY COSTS $709,696
RECOMMENDED SAVINGS* $196,793 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $155,693
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,810
Cost:
$1,864
$1,267 34,548 $543 69 - - - - - - $1,267
34,548
kWh
$543
69
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,305
Cost:
$2,775
$757 20,640 $548 70 - - - - - - $757
20,640
kWh
$548
70
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$671
Cost:
$1,925
$671 17,771 - - - - - - - - $671
17,771
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$143,500
Cost:
$22,000
$67,900 1,852,000 $20,000 2,540 $55,600 7,020 - - - - $67,900
1,852,000
kWh
$20,000
2,540
kW-months/year
$55,600
7,020
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$164
Cost:
$200
- - - - $164 21 - - - - -
-
kWh
-
-
kW-months/year
$164
21
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,034
Cost:
$500
$4,928 134,280 $2,106 269 - - - - - - $4,928
134,280
kWh
$2,106
269
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,880
Cost:
$104
$1,097 29,863 $783 100 - - - - - - $1,097
29,863
kWh
$783
100
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$6,996
Cost:
$500
- - - - $6,996 2,257 - - - - -
-
kWh
-
-
kW-months/year
$6,996
2,257
MMBtu
-
-
$
-
-
$
09: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$33,433
Cost:
$4,000
$167 4,488 $209 26 - - $11,832 - $21,225 - $167
4,488
kWh
$209
26
kW-months/year
-
-
MMBtu
$11,832
-
$
$21,225
-
$
TOTAL RECOMMENDED Savings:
$196,793
Cost:
$33,868
$76,787 2,093,590 $24,189 3,074 $62,760 9,298 $11,832 - $21,225 - $76,787
2,093,590
kWh
$24,189
3,074
kW-months/year
$62,760
9,298
MMBtu
$11,832
-
$
$21,225
-
$
TOTAL IMPLEMENTED Savings:
$155,693
Cost:
$27,443
$75,949 2,071,331 $23,980 3,048 $55,764 7,041 - - - - $75,949
2,071,331
kWh
$23,980
3,048
kW-months/year
$55,764
7,041
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material