IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0034 # 01 Y:1992 01 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,906 $17,000 Not Implemented
IA0034 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,216 $240 Implemented
IA0034 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,355 $200 Not Implemented
IA0034 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $585 $83 Not Implemented
IA0034 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $594 $1,170 Not Implemented
IA0034 # 06 Y:1992 06 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $352 $100 Implemented
IA0017 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $9,858 $700 Implemented
IA0017 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,694 $2,000 Not Implemented
IA0017 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,603 $500 Implemented
IA0017 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,470 $0 Not Implemented
IA0017 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $402 $400 Not Implemented
IA0017 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184 $29 Not Implemented
IA0017 # 07 Y:1992 07 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,834 $22,000 Implemented
IA0017 # 08 Y:1992 08 1992 REDUCE VENTILATION AIR $3,955 $3,150 Not Implemented