Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0010 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $70 | $60 | Not Implemented |
BS0010 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $645 | $251 | Implemented |
BS0010 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,826 | $750 | Not Implemented |
BS0010 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $222 | $512 | Implemented |
BS0010 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $289 | $630 | Not Implemented |
BS0008 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $15 | Not Implemented |
BS0008 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $427 | $227 | Not Implemented |
BS0008 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,079 | $117 | Not Implemented |
BS0008 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,298 | $14,400 | Not Implemented |
BS0008 # 01 Y:2012 | 01 | 2012 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,360 | $350 | Not Implemented |
BS0005 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,970 | $609 | Implemented |
BS0005 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $11,990 | $17,000 | Not Implemented |
BS0005 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,653 | $7,846 | Not Implemented |
BS0005 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,615 | $10,000 | Implemented |
BS0005 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,733 | $178 | Implemented |
BS0005 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $265 | $555 | Not Implemented |
BS0007 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $98 | $0 | Not Implemented |
BS0007 # 06 Y:2012 | 06 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,204 | $7,725 | Not Implemented |
BS0007 # 05 Y:2012 | 05 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,845 | $6,260 | Not Implemented |
BS0007 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $186 | $300 | Not Implemented |
BS0007 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,790 | $4,911 | Not Implemented |
BS0007 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,760 | $649 | Implemented |
BS0006 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,588 | $11,386 | Not Implemented |
BS0006 # 01 Y:2012 | 01 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,105 | $10,500 | Not Implemented |
BS0006 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $154 | $290 | Not Implemented |