Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
87
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0026 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,850 | $752 | Implemented |
BS0026 # 03 Y:2013 | 03 | 2013 | REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL | $1,699 | $1,382 | Not Implemented |
BS0026 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $478 | $15 | Implemented |
BS0026 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $339 | $120 | Implemented |
BS0024 # 01 Y:2013 | 01 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,265 | $5,608 | Not Implemented |
BS0024 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $108 | $30 | Implemented |
BS0024 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $323 | $363 | Implemented |
BS0024 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $118 | $66 | Implemented |
BS0024 # 06 Y:2013 | 06 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,029 | $210 | Not Implemented |
BS0024 # 07 Y:2013 | 07 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $74 | $264 | Not Implemented |
BS0024 # 08 Y:2013 | 08 | 2013 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $187 | $120 | Implemented |
BS0024 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $553 | $30 | Implemented |
BS0023 # 02 Y:2013 | 02 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,676 | $986 | Implemented |
BS0023 # 01 Y:2013 | 01 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,128 | $10 | Implemented |
BS0023 # 03 Y:2013 | 03 | 2013 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,293 | $61 | Not Implemented |
BS0023 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $983 | $2,950 | Implemented |
BS0023 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $49 | $161 | Implemented |
BS0022 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,989 | $218 | Implemented |
BS0022 # 01 Y:2013 | 01 | 2013 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $3,444 | $500 | Implemented |
BS0022 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,022 | $26,934 | Not Implemented |
BS0022 # 05 Y:2013 | 05 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $1,748 | $697 | Implemented |
BS0022 # 04 Y:2013 | 04 | 2013 | COVER OPEN TANKS | $418 | $310 | Not Implemented |
BS0022 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $15 | Implemented |
BS0019 # 08 Y:2013 | 08 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $310 | $25 | Not Implemented |
BS0019 # 06 Y:2013 | 06 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $349 | Implemented |