Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0109 # 10 Y:1991 | 10 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $225 | $0 | Implemented |
WI0109 # 09 Y:1991 | 09 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,254 | $0 | Implemented |
WI0109 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $700 | Implemented |
WI0109 # 07 Y:1991 | 07 | 1991 | INSTALL STORM WINDOWS AND DOORS | $803 | $2,466 | Implemented |
WI0109 # 06 Y:1991 | 06 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $716 | $800 | Implemented |
WI0109 # 05 Y:1991 | 05 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,530 | $500 | Implemented |
WI0109 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,688 | $16,237 | Implemented |
WI0109 # 03 Y:1991 | 03 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,030 | $0 | Implemented |
WI0109 # 02 Y:1991 | 02 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,683 | $0 | Implemented |
WI0109 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $13,347 | $6,250 | Implemented |
WI0106 # 12 Y:1991 | 12 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,220 | $0 | Not Implemented |
WI0106 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $32,440 | $10,800 | Not Implemented |
WI0106 # 11 Y:1991 | 11 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $299 | $0 | Not Implemented |
WI0106 # 10 Y:1991 | 10 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $383 | $0 | Not Implemented |
WI0106 # 09 Y:1991 | 09 | 1991 | INSTALL STORM WINDOWS AND DOORS | $733 | $1,544 | Not Implemented |
WI0106 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $912 | $1,500 | Not Implemented |
WI0106 # 07 Y:1991 | 07 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $958 | $1,000 | Not Implemented |
WI0106 # 06 Y:1991 | 06 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,015 | $500 | Not Implemented |
WI0106 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $1,351 | $600 | Not Implemented |
WI0106 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,862 | $800 | Not Implemented |
WI0106 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,727 | $3,515 | Not Implemented |
WI0106 # 02 Y:1991 | 02 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,780 | $10,000 | Not Implemented |