IAC Assessment: WI0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product AUTO LIGHTING LENSES
NAICS n/a
SIC 3647 - Vehicular Lighting Equipment
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $630,024 9,152,697 kWh $0.07
Natural Gas $148,658 33,197 MMBtu $4.48
TOTAL ENERGY COSTS $778,682
RECOMMENDED SAVINGS* $55,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$32,440
Cost:
$10,800
$32,440 471,278 - - $32,440
471,278
kWh
-
-
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,780
Cost:
$10,000
$11,780 - - - $11,780
-
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,727
Cost:
$3,515
$2,727 39,566 - - $2,727
39,566
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,862
Cost:
$800
- - $1,862 416 -
-
kWh
$1,862
416
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,351
Cost:
$600
$1,351 19,637 - - $1,351
19,637
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,015
Cost:
$500
- - $1,015 227 -
-
kWh
$1,015
227
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$958
Cost:
$1,000
$958 14,068 - - $958
14,068
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$912
Cost:
$1,500
$912 13,189 - - $912
13,189
kWh
-
-
MMBtu
09: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$733
Cost:
$1,544
- - $733 164 -
-
kWh
$733
164
MMBtu
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$383
Cost:
-
$383 5,569 - - $383
5,569
kWh
-
-
MMBtu
11: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$299
Cost:
-
$299 4,396 - - $299
4,396
kWh
-
-
MMBtu
12: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,220
Cost:
-
- - $1,220 273 -
-
kWh
$1,220
273
MMBtu
TOTAL RECOMMENDED Savings:
$55,680
Cost:
$30,259
$50,850 567,703 $4,830 1,080 $50,850
567,703
kWh
$4,830
1,080
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas