Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,207
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0211 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $1,149 | $361 | n/a |
IP0211 # 07 Y:2025 | 07 | 2025 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $76,792 | $70,000 | n/a |
IP0211 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,011 | $0 | n/a |
IP0211 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,605 | $573 | n/a |
IP0211 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,109 | $25 | n/a |
IP0211 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $820 | $0 | n/a |
IP0211 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,506 | $0 | n/a |
IP0211 # 08 Y:2025 | 08 | 2025 | INSTALL STEAM TRAP | $2,051 | $4,950 | n/a |
IC0326 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $2,266 | $2,982 | n/a |
IC0326 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,819 | $678 | n/a |
IC0326 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $0 | n/a |
IC0326 # 10 Y:2025 | 10 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $93 | $0 | n/a |
IC0326 # 09 Y:2025 | 09 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $941 | $0 | n/a |
IC0326 # 01 Y:2025 | 01 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,345 | $13,327 | n/a |
IC0326 # 06 Y:2025 | 06 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $657 | $3,632 | n/a |
IC0326 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $393 | $1,089 | n/a |
IC0326 # 08 Y:2025 | 08 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,398 | $114,881 | n/a |
IC0326 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,821 | $4,859 | n/a |
IC0325 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,149 | $5,256 | n/a |
IC0325 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $149 | $144 | n/a |
IC0325 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,137 | $0 | n/a |
IC0325 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $5,309 | n/a |
IC0325 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,175 | $2,940 | n/a |
IC0325 # 02 Y:2025 | 02 | 2025 | INSTALL EFFICIENT RECTIFIERS | $8,079 | $8,129 | n/a |
IC0325 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,350 | $246 | n/a |