Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0332 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $82 | $137 | n/a |
IC0332 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,248 | $81,420 | n/a |
IC0332 # 07 Y:2025 | 07 | 2025 | REPLACE BOILER | $17,004 | $104,568 | n/a |
IC0332 # 03 Y:2025 | 03 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $254 | $800 | n/a |
IC0332 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,189 | $1,828 | n/a |
IC0332 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $593 | $3,461 | n/a |
IC0332 # 05 Y:2025 | 05 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $1,821 | $2,450 | n/a |
MZ0381 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,828 | $0 | n/a |
MZ0381 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,000 | $19,875 | n/a |
MZ0381 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $87,568 | $395,000 | n/a |
MZ0381 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $318,110 | $818,754 | n/a |
MZ0381 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $428,798 | $4,387,498 | n/a |
MZ0381 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $24,783 | $28,280 | n/a |
MZ0380 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $105,308 | $41,000 | n/a |
IP7027 # 01 Y:2025 | 01 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $715 | $77 | n/a |
MZ0380 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $4,713 | $2,400 | n/a |
IP7027 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,297 | $1,750 | n/a |
MZ0380 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $81,337 | $387,626 | n/a |
MZ0380 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $53,986 | $195,000 | n/a |
IP7027 # 03 Y:2025 | 03 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,551 | $11,300 | n/a |
MZ0380 # 11 Y:2025 | 11 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53,306 | $145,600 | n/a |
MZ0380 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,784 | $447,535 | n/a |
IP7027 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $672 | $3,229 | n/a |
MZ0380 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,856 | $3,000 | n/a |
MZ0380 # 05 Y:2025 | 05 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,506 | $19,860 | n/a |