IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

409

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0255 # 08 Y:1995 08 1995 USE OPTIMUM THICKNESS INSULATION $671 $1,067 n/a
WI0255 # 11 Y:1995 11 1995 RECOVER AND REUSE WASTE MATERIAL $1,150 $0 n/a
WI0255 # 06 Y:1995 06 1995 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,281 $3,600 n/a
WI0255 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,521 $0 n/a
WI0255 # 03 Y:1995 03 1995 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $2,897 $6,500 n/a
WI0255 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,141 $300 n/a
WI0255 # 05 Y:1995 05 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,060 $0 n/a
WI0255 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,156 $4,639 n/a
WI0248 # 02 Y:1995 02 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,647 $7,000 Implemented
WI0249 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,781 $150 Not Implemented
WI0249 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $97 Not Implemented
WI0248 # 03 Y:1995 03 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,170 $1,000 Implemented
WI0248 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $539 $2,160 Not Implemented
WI0248 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $779 $640 Not Implemented
WI0248 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $656 $2,000 Implemented
WI0248 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157 $514 Implemented
WI0249 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $1,712 $500 Not Implemented
WI0248 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,240 $800 Implemented
WI0248 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $276 $0 Implemented
WI0249 # 01 Y:1995 01 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,906 $4,500 Not Implemented
WI0248 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $488 $0 Implemented
WI0249 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $359 $0 Not Implemented
WI0249 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,153 $250 Implemented
WI0254 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $764 $0 Not Implemented
WI0254 # 04 Y:1995 04 1995 USE OPTIMUM THICKNESS INSULATION $1,323 $1,461 Implemented