IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0028 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $0 Implemented
IP0028 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $13 Implemented
IP0028 # 03 Y:2014 03 2014 INSTALL SET-BACK TIMERS $1,201 $196 Implemented
IP0028 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $147 $76 Implemented
IP0028 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $282 $357 Implemented
IP0028 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $655 $2,312 Not Implemented
IP0028 # 07 Y:2014 07 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,354 $5,025 Not Implemented
IP0025 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,805 $0 Not Implemented
IP0025 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,161 $0 Not Implemented
IP0025 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Not Implemented
IP0025 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,545 $0 Not Implemented
IP0025 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $60 Not Implemented
IP0025 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $0 Not Implemented
IP0025 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,123 $1,770 Not Implemented
IP0025 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,944 $3,961 Not Implemented
UD0814 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,324 $60,476 Implemented
UD0814 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,387 $28,012 Implemented
UD0814 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,684 $21,115 Not Implemented
UD0814 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $899 $1,724 Implemented
UD0814 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $0 Implemented
UD0814 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,642 $1,000 Implemented
UD0814 # 07 Y:2010 07 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $137 $540 Not Implemented
UD0814 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $18,417 $9,030 Not Implemented
UD0814 # 09 Y:2010 09 2010 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $8,568 $3,000 Implemented
UD0814 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,017 $400 Implemented