IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

779

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0031 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,504 $3,500 Not Implemented
TS0031 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,147 $50 Not Implemented
TS0031 # 04 Y:1985 04 1985 REDUCE GLAZED AREAS IN BUILDINGS $1,681 $1,360 Not Implemented
TS0031 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,076 $280 Not Implemented
TS0031 # 06 Y:1985 06 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,081 $500 Not Implemented
TS0028 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,831 $0 Not Implemented
TS0028 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,428 $0 Not Implemented
TS0028 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $811 $300 Not Implemented
TS0029 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $65,767 $60,000 Not Implemented
TS0029 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,874 $100 Not Implemented
TS0029 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,514 $2,892 Not Implemented
TS0011 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,244 $500 Not Implemented
TS0011 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $246 $0 Not Implemented
TS0011 # 03 Y:1984 03 1984 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,415 $0 Not Implemented
TS0011 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $677 $2,376 Not Implemented
TS0011 # 05 Y:1984 05 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $217 $0 Not Implemented
TS0011 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $242 $500 Not Implemented
TS0011 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $481 $800 Not Implemented
TS0007 # 01 Y:1984 01 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,640 $34,000 Not Implemented
TS0007 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,248 $25,350 Not Implemented
TS0007 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,860 $0 Implemented
TS0007 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,243 $0 Implemented
TS0001 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,951 $16,300 Implemented
TS0001 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,140 $29,400 Not Implemented
TS0001 # 03 Y:1984 03 1984 USE MINIMUM SAFE OVEN VENTILATION $335 $300 Implemented