IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,476

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUWT03 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $350 Not Implemented
IP0176 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $540 $0 Not Implemented
IP0176 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,592 $1,946 Not Implemented
IP0176 # 03 Y:2023 03 2023 USE RADIANT HEATER FOR SPOT HEATING $4,356 $5,979 Not Implemented
IP0175 # 01 Y:2023 01 2023 USE OPTIMUM TEMPERATURE $452 $0 Not Implemented
IP0175 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $30,222 $6,500 Not Implemented
IP0175 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $22,456 $24,300 Not Implemented
MUWT02 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $20 Not Implemented
MUWT02 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $294 $0 Not Implemented
MUWT02 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,399 Not Implemented
IP0174 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $42,275 $0 Implemented
IP0174 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,401 $1,048 Implemented
IP0174 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,877 $14,812 Implemented
IP0174 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,006 $2,730 Implemented
IP0174 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,518 $123,235 Implemented
IP0174 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,594 $78,000 Not Implemented
IP0173 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,485 $0 Not Implemented
IP0173 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,055 $0 Not Implemented
IP0173 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,365 $840 Not Implemented
IP0173 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,684 $61,320 Not Implemented
IP0173 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $1,042 Not Implemented
IP0173 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $6,837 $33,000 Not Implemented
IC0279 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $538 $1,455 Implemented
IC0279 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $2,613 $254 Implemented
IC0279 # 03 Y:2023 03 2023 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $205,098 $12,050 Not Implemented