Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
183
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0055 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,465 | $3 | Not Implemented |
IP0055 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,177 | $86 | Implemented |
IP0055 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,460 | $1,880 | Not Implemented |
IP0055 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $568 | $1,146 | Not Implemented |
IP0055 # 04 Y:2015 | 04 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,413 | $3 | Not Implemented |
IP0055 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,460 | $3 | Implemented |
IP0055 # 02 Y:2015 | 02 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,351 | $0 | Implemented |
IP0054 # 01 Y:2015 | 01 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $329 | $0 | Not Implemented |
IP0054 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,367 | $2,184 | Not Implemented |
IP0054 # 02 Y:2015 | 02 | 2015 | PAY BILLS ON TIME TO AVOID LATE FEES | $576 | $0 | Implemented |
IP0054 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $375 | $1,348 | Not Implemented |
IP0053 # 01 Y:2015 | 01 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $57,305 | $915 | Implemented |
IP0053 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,650 | $2,685 | Implemented |
IP0053 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $456 | $924 | Implemented |
IP0053 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,294 | $160 | Implemented |
IP0053 # 03 Y:2015 | 03 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $38,029 | $5,000 | Implemented |
IP0052 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $50 | $179 | Not Implemented |
IP0052 # 09 Y:2015 | 09 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,874 | $4,725 | Not Implemented |
IP0052 # 04 Y:2015 | 04 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $12,878 | $902 | Implemented |
IP0052 # 08 Y:2015 | 08 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $12,926 | $10,000 | Implemented |
IP0052 # 01 Y:2015 | 01 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,077 | $47 | Implemented |
IP0052 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,655 | $61 | Implemented |
IP0052 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $6,052 | $2,650 | Not Implemented |
IP0052 # 07 Y:2015 | 07 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $10,505 | $7,153 | Implemented |
IP0052 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $437 | $9 | Implemented |