IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

192

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP7010 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,570 $46,012 Not Implemented
IP7010 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $9,650 $4,281 Not Implemented
IP7010 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $372 $1,692 Not Implemented
IP7009 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,166 $665 Implemented
IP7009 # 03 Y:2023 03 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $19,017 $16,650 Not Implemented
IP7009 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $470 $325 Implemented
IP0187 # 04 Y:2023 04 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $238 $1,514 Not Implemented
IP0187 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,797 $42,271 Not Implemented
IP0187 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $0 Not Implemented
IP0187 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $242 $74 Not Implemented
IP0186 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $440 $0 Not Implemented
IP0186 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $4,430 Not Implemented
IP0186 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $97 $93 Not Implemented
IP0186 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,614 $2,164 Not Implemented
IP0186 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,473 $71 Not Implemented
IP0186 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,193 $750 Not Implemented
IP0185 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,963 $14,490 Not Implemented
IP0185 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $692 $273 Not Implemented
IP0185 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $738 $180 Not Implemented
IP0185 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,389 $2,562 Not Implemented
IP0185 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,263 $354 Not Implemented
IP0185 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,450 $0 Not Implemented
IP0184 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,667 $2,615 Implemented
IP0184 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,142 $12,019 Implemented
IP0184 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,216 $17,960 Implemented