IAC logo
IAC Assessment: IP0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2023
Principal Product Magnet Wire
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351 - Copper Rolling And Drawing
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 329,613
Annual Production 138,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,012,451 31,897,952 kWh $0.06
Electricity Demand $837,931 51,660 kW-months/year $16.22
Electricity Fees $7,896 - $ -
Natural Gas $901,965 180,347 MMBtu $5.00
TOTAL ENERGY COSTS $3,760,243
RECOMMENDED SAVINGS* $141,947 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$14,493
Cost:
-
- - $14,493 894 - - -
-
kWh
$14,493
894
kW-months/year
-
-
MMBtu
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$83,429
Cost:
$20,365
- - - - $83,429 16,685 -
-
kWh
-
-
kW-months/year
$83,429
16,685
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,667
Cost:
$2,615
$7,093 112,584 $1,574 97 - - $7,093
112,584
kWh
$1,574
97
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,216
Cost:
$17,960
$31,216 496,214 - - - - $31,216
496,214
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,142
Cost:
$12,019
$3,062 48,604 $1,080 67 - - $3,062
48,604
kWh
$1,080
67
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$141,947
Cost:
$52,959
$41,371 657,402 $17,147 1,057 $83,429 16,685 $41,371
657,402
kWh
$17,147
1,057
kW-months/year
$83,429
16,685
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas