Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0380 # 10 Y:1992 | 10 | 1992 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $2,875 | $2,500 | Not Implemented |
KU0381 # 01 Y:1992 | 01 | 1992 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,545 | $20 | Implemented |
KU0380 # 08 Y:1992 | 08 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,375 | $3,500 | Implemented |
KU0380 # 09 Y:1992 | 09 | 1992 | INSTALL TURBULATORS | $1,424 | $1,000 | Implemented |
KU0381 # 02 Y:1992 | 02 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $472 | $2,300 | Not Implemented |
KU0380 # 01 Y:1992 | 01 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,557 | $93,650 | Not Implemented |
KU0380 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $715 | $500 | Not Implemented |
KU0380 # 07 Y:1992 | 07 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,034 | $4,860 | Implemented |
KU0380 # 02 Y:1992 | 02 | 1992 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $10,269 | $73,000 | Not Implemented |
KU0381 # 03 Y:1992 | 03 | 1992 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $150 | $30 | Implemented |
KU0381 # 07 Y:1992 | 07 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $450 | $716 | Implemented |
KU0381 # 09 Y:1992 | 09 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $429 | $1,400 | Implemented |
KU0381 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $83 | $0 | Not Implemented |
KU0380 # 12 Y:1992 | 12 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8 | $0 | Implemented |
KU0381 # 04 Y:1992 | 04 | 1992 | INSTALL SET-BACK TIMERS | $751 | $700 | Implemented |
KU0380 # 04 Y:1992 | 04 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,815 | $1,000 | Not Implemented |
KU0380 # 06 Y:1992 | 06 | 1992 | INSULATE BARE EQUIPMENT | $3,220 | $4,298 | Implemented |
KU0381 # 06 Y:1992 | 06 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $667 | $0 | Not Implemented |
KU0381 # 08 Y:1992 | 08 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $322 | $0 | Implemented |
KU0380 # 03 Y:1992 | 03 | 1992 | RECOVER AND REUSE COOLING WATER | $19,128 | $0 | Not Implemented |
KU0380 # 11 Y:1992 | 11 | 1992 | INSTALL SET-BACK TIMERS | $1,153 | $1,200 | Not Implemented |
KU0376 # 13 Y:1992 | 13 | 1992 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $520 | $185 | Not Implemented |
KU0376 # 12 Y:1992 | 12 | 1992 | INSULATE BARE EQUIPMENT | $4,572 | $3,450 | Not Implemented |
KU0376 # 06 Y:1992 | 06 | 1992 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,694 | $0 | Not Implemented |
KU0376 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,366 | $90,000 | Not Implemented |