IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0173 # 05 Y:1985 05 1985 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $777 $200 Implemented
KU0173 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,572 $1,200 Not Implemented
KU0164 # 09 Y:1985 09 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $153 $0 Implemented
KU0164 # 08 Y:1985 08 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $6,610 $3,000 Implemented
KU0164 # 07 Y:1985 07 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,050 $600 Not Implemented
KU0164 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,808 $650 Implemented
KU0164 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,269 $3,069 Not Implemented
KU0164 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $100 Not Implemented
KU0164 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,475 $500 Implemented
KU0164 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,280 $4,700 Not Implemented
KU0164 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,820 $500 Implemented
KU0140 # 05 Y:1984 05 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,911 $4,000 Not Implemented
KU0140 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,927 $4,258 Not Implemented
KU0140 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $6,149 $577 Not Implemented
KU0140 # 03 Y:1984 03 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,259 $697 Not Implemented
KU0140 # 04 Y:1984 04 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,737 $8,500 Not Implemented
KU0140 # 06 Y:1984 06 1984 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,864 $1,500 Not Implemented
KU0140 # 07 Y:1984 07 1984 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $755 $900 Not Implemented
KU0140 # 14 Y:1984 14 1984 IMPROVE LUBRICATION PRACTICES $5,575 $5,000 Not Implemented
KU0140 # 17 Y:1984 17 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $462 $910 Not Implemented
KU0140 # 18 Y:1984 18 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $30 Implemented
KU0140 # 19 Y:1984 19 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $165 $90 Implemented
KU0140 # 16 Y:1984 16 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $246 $15 Not Implemented
KU0140 # 15 Y:1984 15 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,443 $500 Not Implemented
KU0140 # 11 Y:1984 11 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $194 Not Implemented