IAC logo
IAC Assessment: KU0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product PRINTING
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 360,000 Pieces
Production Hrs. Annual 6,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $218,902 4,164,127 kWh $0.05
Natural Gas $46,420 10,132 MMBtu $4.58
TOTAL ENERGY COSTS $265,322
RECOMMENDED SAVINGS* $62,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $273
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,927
Cost:
$4,258
$3,927 74,736 - - $3,927
74,736
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,149
Cost:
$577
$2,957 56,272 $3,192 697 $2,957
56,272
kWh
$3,192
697
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$9,259
Cost:
$697
$2,018 38,394 $7,241 1,581 $2,018
38,394
kWh
$7,241
1,581
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,737
Cost:
$8,500
$13,737 261,430 - - $13,737
261,430
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,911
Cost:
$4,000
$2,911 55,393 - - $2,911
55,393
kWh
-
-
MMBtu
06: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$2,864
Cost:
$1,500
$2,864 54,513 - - $2,864
54,513
kWh
-
-
MMBtu
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$755
Cost:
$900
$755 14,361 - - $755
14,361
kWh
-
-
MMBtu
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,879
Cost:
$20
$1,879 35,756 - - $1,879
35,756
kWh
-
-
MMBtu
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,757
Cost:
$3,000
- - $2,757 602 -
-
kWh
$2,757
602
MMBtu
10: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,942
Cost:
$3,384
- - $1,942 424 -
-
kWh
$1,942
424
MMBtu
11: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$192
Cost:
$194
- - $192 42 -
-
kWh
$192
42
MMBtu
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$701
Cost:
$650
- - $701 153 -
-
kWh
$701
153
MMBtu
13: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,135
Cost:
$6,000
$7,135 - - - $7,135
-
kWh
-
-
MMBtu
14: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$5,575
Cost:
$5,000
$5,575 106,096 - - $5,575
106,096
kWh
-
-
MMBtu
15: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$1,443
Cost:
$500
- - $1,443 315 -
-
kWh
$1,443
315
MMBtu
16: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$246
Cost:
$15
$246 4,689 - - $246
4,689
kWh
-
-
MMBtu
17: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$462
Cost:
$910
$462 8,792 - - $462
8,792
kWh
-
-
MMBtu
18: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$108
Cost:
$30
$108 2,052 - - $108
2,052
kWh
-
-
MMBtu
19: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$165
Cost:
$90
- - $165 36 -
-
kWh
$165
36
MMBtu
TOTAL RECOMMENDED Savings:
$62,207
Cost:
$40,225
$44,574 712,484 $17,633 3,850 $44,574
712,484
kWh
$17,633
3,850
MMBtu
TOTAL IMPLEMENTED Savings:
$273
Cost:
$120
$108 2,052 $165 36 $108
2,052
kWh
$165
36
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas