IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

227

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1702 # 16 Y:2017 16 2017 CLEAN CONDENSER TUBES $1,879 $300 Not Implemented
UK1702 # 17 Y:2017 17 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,048 $0 Not Implemented
UK1614 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $132,318 $126,876 Implemented
UK1614 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,584 $22,000 Not Implemented
UK1614 # 03 Y:2017 03 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,324 $4,351 Not Implemented
UK1614 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $20,641 Implemented
UK1614 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,465 $1,800 Not Implemented
UK1614 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $0 Not Implemented
UK1614 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $552 $318 Not Implemented
UK1614 # 08 Y:2017 08 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $1,614 $4,335 Implemented
UK1614 # 09 Y:2017 09 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $823 $0 Not Implemented
UK1515 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,141 $3,760 Implemented
UK1515 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,346 $11,375 Implemented
UK1515 # 03 Y:2015 03 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $597 $0 Implemented
UK1515 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,105 $1,169 Implemented
UK1515 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,215 $0 Implemented
UK1515 # 06 Y:2015 06 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $426 $0 Not Implemented
UK1515 # 07 Y:2015 07 2015 CLEAN CONDENSER TUBES $575 $500 Implemented
UK1515 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,702 $1,700 Implemented
UK1515 # 09 Y:2015 09 2015 UPGRADE CONTROLS ON COMPRESSORS $15,940 $12,750 Not Implemented
UK1515 # 10 Y:2015 10 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $838 $0 Implemented
UK1515 # 11 Y:2015 11 2015 ELIMINATE/REDUCE AN OPERATION $144,648 $0 Implemented
UK1515 # 12 Y:2015 12 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,162 $4,332 Not Implemented
UK1515 # 13 Y:2015 13 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $976 $854 Implemented
UK1515 # 14 Y:2015 14 2015 REPAIR AND ELIMINATE STEAM LEAKS $10,160 $5,539 Implemented