Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
250
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2101 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $783 | $2,210 | n/a |
UK2101 # 07 Y:2021 | 07 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $32,159 | $7,382 | n/a |
UK2101 # 06 Y:2021 | 06 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $16,094 | $170 | n/a |
UK2101 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,495 | $2,215 | n/a |
UK2101 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,953 | $2,145 | n/a |
UK2101 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $102,514 | $43,405 | n/a |
UK2101 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,574 | $6,800 | n/a |
UK2101 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,186 | $12,380 | n/a |
UK2101 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,735 | $6,438 | n/a |
UK1916 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,602 | $2,270 | n/a |
UK1916 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,402 | $2,614 | n/a |
UK1916 # 05 Y:2019 | 05 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $4,922 | $11,550 | n/a |
UK1916 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $195 | $75 | n/a |
UK1916 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,394 | $25,674 | n/a |
UK1916 # 02 Y:2019 | 02 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $18,894 | $0 | n/a |
UK1916 # 01 Y:2019 | 01 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,170 | $0 | n/a |
UK1916 # 10 Y:2019 | 10 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $139,706 | $225,000 | n/a |
UK1916 # 09 Y:2019 | 09 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $86,132 | $206,000 | n/a |
UK1916 # 08 Y:2019 | 08 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,946 | $0 | n/a |
UK1908 # 13 Y:2019 | 13 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,547 | $8,300 | Implemented |
UK1908 # 18 Y:2019 | 18 | 2019 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $21,879 | $28,230 | Not Implemented |
UK1908 # 17 Y:2019 | 17 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,430 | $0 | Implemented |
UK1908 # 16 Y:2019 | 16 | 2019 | INSULATE BARE EQUIPMENT | $13,639 | $18,226 | Not Implemented |
UK1908 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,676 | $22,903 | Implemented |
UK1908 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $553 | $227 | Not Implemented |