IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

156

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0131 # 08 Y:1995 08 1995 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $30,600 $330 Implemented
UL0131 # 09 Y:1995 09 1995 RECOVER AND REUSE WASTE MATERIAL $18,600 $0 Implemented
UL0131 # 10 Y:1995 10 1995 USE LESS WASTEFUL PACKAGING $28,800 $27,200 Not Implemented
UD0392 # 01 Y:1993 01 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,912 $34,000 Not Implemented
UD0392 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,218 $0 Implemented
UD0392 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,501 $54,400 Implemented
UD0392 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,274 $0 Implemented
UD0392 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,755 $1,000 Implemented
UD0392 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,469 $630 Implemented
UD0346 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $7,193 $5,000 Implemented
UD0346 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $7,995 $0 Implemented
UD0346 # 03 Y:1991 03 1991 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,769 $0 Implemented
UD0346 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $5,106 $5,000 Implemented
UD0346 # 05 Y:1991 05 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,053 $0 Implemented
TN0391 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,900 $480 Implemented
TN0391 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,800 $5,200 Implemented
TN0391 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,950 $1,800 Implemented
TN0391 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,420 $2,780 Implemented
TN0391 # 05 Y:1990 05 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $465 $3,000 Not Implemented
TN0391 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $1,421 $263 Not Implemented
TN0391 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $350 Not Implemented
TN0391 # 08 Y:1990 08 1990 INSULATE BARE EQUIPMENT $360 $512 Implemented
TN0391 # 09 Y:1990 09 1990 OPTIMIZE PLANT POWER FACTOR $6,781 $25,000 Implemented
UD0261 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,051 $0 Not Implemented
UD0261 # 02 Y:1988 02 1988 RECOVER AND REUSE COOLING WATER $3,120 $6,000 Implemented