IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1905 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,304 $6,000 Not Implemented
LS1905 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,408 $0 Implemented
LS1905 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,092 $50 Implemented
LS1801 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $54,034 $0 Not Implemented
LS1801 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,691 $0 Not Implemented
LS1801 # 01 Y:2018 01 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,575 $0 Implemented
AM0701 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $195,000 $2,000 Implemented
AM0701 # 08 Y:2016 08 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,420 $210 Implemented
AM0701 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,900 $22,740 Not Implemented
AM0701 # 06 Y:2016 06 2016 USE SYNTHETIC LUBRICANT $35,540 $0 Implemented
AM0701 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $36,800 $61,950 Not Implemented
AM0701 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $57,500 $0 Implemented
AM0701 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,125 $105,700 Implemented
AM0701 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $515,000 $75,000 Implemented
AM0701 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,325 $1,200 Implemented
LL0252 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $76 $79 Implemented
LL0252 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $182 $120 Not Implemented
LL0252 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $525 Implemented
LL0252 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,064 $159 Not Implemented
LL0252 # 04 Y:2006 04 2006 TURN OFF STEAM TRACING DURING MILD WEATHER $1,157 $170 Implemented
LL0252 # 03 Y:2006 03 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,298 $240 Not Implemented
LL0252 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,878 $4,680 Implemented
LL0252 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $91,633 $1,740 Implemented
LL0158 # 05 Y:2003 05 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $116 $226 Implemented
LL0158 # 03 Y:2003 03 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $16,068 $5,800 Implemented