IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,125

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2301 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $2,100 Implemented
LT8364 # 01 Y:2023 01 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $54,602 $0 n/a
LT8364 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,106 $26,500 n/a
LT8364 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,257 $9,840 n/a
LS0323 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $968 $150 Implemented
LS0323 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $444 $250 Implemented
LS0323 # 03 Y:2023 03 2023 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $3,384 $2,100 Not Implemented
LS0323 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $159 $150 Implemented
LS0323 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,354 $8,296 Implemented
LS0223 # 01 Y:2023 01 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $11,364 $1,800 Not Implemented
LS0223 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $160 $50 Implemented
LS0223 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $39 $50 Implemented
LS0223 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,193 $2,990 Implemented
LS0223 # 05 Y:2023 05 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $200 $630 Not Implemented
LT8370 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,372 $1,800 n/a
LT8370 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,034 $0 n/a
LT8370 # 03 Y:2023 03 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $24,363 $0 n/a
LT8370 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,864 $8,022 n/a
LS0123 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $106 $157 Implemented
LS0123 # 02 Y:2023 02 2023 REPLACE BOILER $17,372 $62,400 Implemented
LS0123 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $14,146 $54,880 Implemented
LT8369 # 01 Y:2022 01 2022 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,717 $30,030 n/a
LT8369 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,592 $12,831 n/a
LT8369 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,568 $3,852 n/a
LT8368 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,357 $5,022 Not Implemented