IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0096 # 07 Y:1987 07 1987 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $22,563 $4,750 Implemented
MA0096 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,030 $3,900 Not Implemented
MA0066 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,416 $200 Not Implemented
MA0066 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $200 Implemented
MA0066 # 03 Y:1986 03 1986 INSTALL STORM WINDOWS AND DOORS $474 $1,000 Implemented
MA0066 # 04 Y:1986 04 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,424 $0 Implemented
MA0058 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $90 Implemented
MA0058 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $3,740 $5,760 Implemented
MA0058 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
MA0046 # 01 Y:1985 01 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $738 $1,650 Not Implemented
MA0046 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $74 Implemented
MA0046 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,418 $168 Not Implemented
MA0046 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $924 $1,350 Not Implemented
MA0046 # 05 Y:1985 05 1985 OPTIMIZE PLANT POWER FACTOR $776 $1,875 Not Implemented
MA0009 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $2,206 $2,100 Not Implemented
MA0009 # 02 Y:1984 02 1984 INSTALL SET-BACK TIMERS $1,183 $200 Implemented
MA0009 # 03 Y:1984 03 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $100 $0 Implemented
MA0002 # 01 Y:1984 01 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,889 $200 Implemented
MA0002 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,893 $0 Implemented
MA0002 # 03 Y:1984 03 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,950 $22,000 Not Implemented