IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0073 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $210 Not Implemented
MA0073 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,084 $500 Not Implemented
MA0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $365 $60 Implemented
MA0074 # 01 Y:1986 01 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,075 $1,200 Implemented
MA0074 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122 $300 Implemented
MA0074 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $100 Implemented
MA0074 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $351 $540 Not Implemented
MA0073 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,124 $12,000 Not Implemented
MA0070 # 05 Y:1986 05 1986 AIR CONDITION ONLY SPACE NECESSARY $1,072 $2,000 Not Implemented
MA0070 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,575 $5,300 Not Implemented
MA0070 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,470 $375 Implemented
MA0070 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $200 Implemented
MA0070 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,611 $0 Not Implemented
MA0069 # 03 Y:1986 03 1986 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,505 $11,000 Not Implemented
MA0067 # 01 Y:1986 01 1986 AIR CONDITION ONLY SPACE NECESSARY $262 $0 Implemented
MA0067 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $125 $150 Not Implemented
MA0069 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $873 $300 Implemented
MA0066 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,416 $200 Not Implemented
MA0069 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $943 $1,300 Not Implemented
MA0066 # 03 Y:1986 03 1986 INSTALL STORM WINDOWS AND DOORS $474 $1,000 Implemented
MA0066 # 04 Y:1986 04 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,424 $0 Implemented
MA0066 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $200 Implemented
MA0065 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $730 $85 Not Implemented
MA0065 # 02 Y:1986 02 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $901 $961 Not Implemented
MA0065 # 03 Y:1986 03 1986 COVER OPEN TANKS $1,330 $1,239 Not Implemented