IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0031 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,944 $7,500 Implemented
DL0031 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $0 Not Implemented
DL0031 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,430 $0 Not Implemented
DL0031 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,857 $5,600 Not Implemented
DL0031 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $229 Implemented
DL0031 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $2,224 $0 Not Implemented
DL0031 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,826 $0 Not Implemented
DL0031 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $693 $0 Implemented
DL0031 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $0 Not Implemented
DL0030 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,890 $7,500 Not Implemented
DL0030 # 01 Y:2008 01 2008 REPLACE BOILER $5,600 $0 Not Implemented
DL0030 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,055 $25,852 Implemented
DL0030 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,623 $5,306 Implemented
DL0030 # 05 Y:2008 05 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,675 $0 Implemented
DL0030 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $120 $140 Implemented
DL0029 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,700 $3,250 Not Implemented
DL0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,724 $75,600 Not Implemented
DL0029 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $44,793 $11,000 Implemented
DL0029 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,326 $4,000 Implemented
DL0029 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,200 $500 Not Implemented
DL0027 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,514 $52,000 Implemented
DL0027 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,691 $27,814 Not Implemented
DL0027 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $8,800 $0 Implemented
DL0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $10,800 $1,200 Implemented
DL0024 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,200 $112,000 Implemented