IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0115 # 01 Y:1993 01 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,628 $800 Not Implemented
ME0116 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $270 $200 Not Implemented
ME0117 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,190 $8,500 Not Implemented
ME0117 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $100 Implemented
ME0117 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,110 $4,500 Not Implemented
ME0117 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,377 $150 Not Implemented
ME0116 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $2,907 $1,200 Implemented
ME0116 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $100 Not Implemented
ME0116 # 01 Y:1993 01 1993 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,946 $7,000 Implemented
ME0115 # 07 Y:1993 07 1993 PAY UTILITY BILLS ON TIME $3,042 $0 Not Implemented
ME0115 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,600 $2,000 Implemented
ME0115 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $965 $100 Implemented
ME0115 # 04 Y:1993 04 1993 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,080 $3,000 Not Implemented
ME0115 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $1,882 $2,500 Not Implemented
ME0115 # 02 Y:1993 02 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $106,916 $100,000 Not Implemented
ME0117 # 05 Y:1993 05 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,071 $900 Not Implemented
ME0114 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $550 $250 Not Implemented
ME0114 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $597 $1,250 Not Implemented
ME0108 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $5,990 $5,000 Not Implemented
ME0114 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,503 $4,500 Not Implemented
ME0114 # 01 Y:1993 01 1993 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $990 $500 Not Implemented
ME0108 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,990 $500 Implemented
ME0108 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,804 $18,100 Implemented
ME0108 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,170 $250 Implemented
ME0108 # 01 Y:1993 01 1993 PAY UTILITY BILLS ON TIME $5,548 $0 Implemented