IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0187 # 02 Y:2001 02 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,700 $2,000 Not Implemented
UM0187 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $6,100 $800 Not Implemented
UM0186 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,000 $3,500 n/a
UM0186 # 01 Y:2001 01 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $21,500 $4,100 n/a
UM0186 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $7,700 $700 n/a
UM0186 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $500 n/a
UM0186 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,000 $300 n/a
UM0186 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $700 n/a
UM0186 # 07 Y:2001 07 2001 OPTIMIZE PLANT POWER FACTOR $1,500 $2,300 n/a
UM0186 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,000 n/a
ND0297 # 11 Y:1998 11 1998 RECOVER WASTE HEAT FROM EQUIPMENT $73 $300 Implemented
ND0297 # 10 Y:1998 10 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $167 $600 Not Implemented
ND0297 # 09 Y:1998 09 1998 DISCONNECT BALLASTS $194 $176 Not Implemented
ND0297 # 08 Y:1998 08 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $256 $600 Not Implemented
ND0297 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $240 Not Implemented
ND0297 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $410 $180 Implemented
ND0297 # 05 Y:1998 05 1998 $868 $250 Not Implemented
ND0297 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $2,278 $3,600 Not Implemented
ND0297 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,791 $14,171 Implemented
ND0297 # 02 Y:1998 02 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,131 $9,600 Not Implemented
ND0297 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,421 $10,400 Implemented
ND0257 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,350 $0 Not Implemented
ND0257 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,666 $585 Not Implemented
ND0257 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,584 $725 Implemented
ND0257 # 05 Y:1996 05 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $164 $1,344 Implemented