IAC Assessment: ND0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product Corrugated Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 120,000
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 2,912
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,096 599,648 kWh $0.10
Electricity Demand $40,447 3,548 kW-months/year $11.40
Electricity Fees $3,730 - $ -
Natural Gas $45,432 11,566 MMBtu $3.93
TOTAL ENERGY COSTS $148,732
RECOMMENDED SAVINGS* $17,878 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,695
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,421
Cost:
$10,400
$3,299 66,530 $3,122 274 - - - - - - $3,299
66,530
kWh
$3,122
274
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,131
Cost:
$9,600
- - - - - - $4,131 1,152 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,131
1,152
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,791
Cost:
$14,171
$1,427 28,429 $1,364 120 - - - - - - $1,427
28,429
kWh
$1,364
120
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,278
Cost:
$3,600
$2,278 24,912 - - - - - - - - $2,278
24,912
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 4.8110 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$868
Cost:
$250
- - - - $868 - - - - - -
-
kWh
-
-
kW-months/year
$868
-
$
-
-
MMBtu
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$410
Cost:
$180
$410 4,396 - - - - - - - - $410
4,396
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$289
Cost:
$240
$289 2,052 - - - - - - - - $289
2,052
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$256
Cost:
$600
- - - - - - - - $256 208,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$256
208,000
Tgal
09: 2.7122 DISCONNECT BALLASTS Savings:
$194
Cost:
$176
$194 2,052 - - - - - - - - $194
2,052
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$167
Cost:
$600
$167 1,758 - - - - - - - - $167
1,758
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$73
Cost:
$300
- - - - - - $73 19 - - -
-
kWh
-
-
kW-months/year
-
-
$
$73
19
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$17,878
Cost:
$40,117
$8,064 130,129 $4,486 394 $868 - $4,204 1,171 $256 208,000 $8,064
130,129
kWh
$4,486
394
kW-months/year
$868
-
$
$4,204
1,171
MMBtu
$256
208,000
Tgal
TOTAL IMPLEMENTED Savings:
$9,695
Cost:
$25,051
$5,136 99,355 $4,486 394 - - $73 19 - - $5,136
99,355
kWh
$4,486
394
kW-months/year
-
-
$
$73
19
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal