Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0223 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $406 $200 n/a
WM0223 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $946 $0 n/a
WM0223 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $971 $0 n/a
WM0223 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,062 $994 n/a
WM0223 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,472 $5,580 n/a
WM0223 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,737 $8,466 n/a
WM0222 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,041 $0 n/a
WM0222 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,034 $4,262 n/a
WM0222 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,848 $12,763 n/a
WM0222 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,099 $21,586 n/a
DS0158 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $763 $1,113 Implemented
DS0158 # 06 Y:2000 06 2000 $817 $0 Not Implemented
DS0158 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,244 $4,230 Implemented
DS0158 # 04 Y:2000 04 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $-2,948 $3,295 Not Implemented
DS0158 # 03 Y:2000 03 2000 USE POWER DURING OFF-PEAK PERIODS $1,067 $900 Implemented
DS0158 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $6,312 $2,897 Not Implemented
DS0138 # 05 Y:1999 05 1999 UPGRADE CONTROLS ON COMPRESSORS $1,165 $241 Implemented
DS0138 # 06 Y:1999 06 1999 $1,688 $0 Not Implemented
DS0138 # 07 Y:1999 07 1999 INCREASE USE OF AUTOMATION $96,760 $65,000 Implemented
DS0138 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,384 $998 Implemented
DS0138 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $242 $110 Not Implemented
DS0138 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $629 $875 Implemented
DS0138 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,273 $400 Not Implemented
DS0086 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $6,948 $3,808 Implemented
DS0086 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $960 $0 Implemented