IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0157 # 04 Y:2014 04 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,223 $17,400 Not Implemented
MZ0157 # 05 Y:2014 05 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,840 $9,600 Implemented
MZ0142 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,862 $6,500 Not Implemented
MZ0142 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $505 $1,000 Not Implemented
MZ0142 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $2,500 Not Implemented
MZ0142 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $206 $720 Not Implemented
MZ0142 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,435 $31,000 Implemented
MZ0142 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $1,432 $980 Not Implemented
MZ0116 # 01 Y:2013 01 2013 USE PHOTOCELL CONTROLS $2,023 $900 Not Implemented
MZ0116 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,131 $0 Not Implemented
MZ0116 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $1,000 Not Implemented
MZ0116 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,715 $93,750 Not Implemented
MZ0116 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,431 $1,160 Not Implemented
MZ0130 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,164 $1,000 Implemented
MZ0130 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,092 $5,800 Not Implemented
MZ0130 # 03 Y:2013 03 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $17,041 $5,200 Implemented
MZ0130 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,911 $36,015 Implemented
MZ0130 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $49,337 $60,000 Not Implemented
MZ0130 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,741 $0 Not Implemented
MZ0113 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,414 $8,758 Implemented
MZ0113 # 02 Y:2013 02 2013 INSTALL SKYLIGHTS $14,502 $50,050 Not Implemented
MZ0113 # 03 Y:2013 03 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $7,609 $1,000 Implemented
MZ0113 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,882 $1,698 Implemented
MZ0113 # 05 Y:2013 05 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $3,613 $4,973 Implemented
MZ0113 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $3,575 $3,500 Implemented