IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0326 # 10 Y:1990 10 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
KU0326 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49 $30 Not Implemented
KU0326 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $293 $0 Not Implemented
KU0326 # 07 Y:1990 07 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $708 $0 Implemented
KU0326 # 01 Y:1990 01 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,883 $450 Implemented
KU0326 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,633 $9,000 Not Implemented
KU0326 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $2,295 $520 Not Implemented
KU0326 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $706 $520 Implemented
KU0326 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $100 Implemented
KU0326 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $317 $100 Implemented
MO0005 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $72 Implemented
MO0005 # 05 Y:1990 05 1990 INSTALL AUTOMATIC STACK DAMPER $585 $175 Implemented
MO0005 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,436 $3,500 Implemented
MO0005 # 03 Y:1990 03 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,935 $351 Not Implemented
MO0005 # 02 Y:1990 02 1990 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,712 $9,886 Implemented
MO0005 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $2,439 $3,511 Implemented
KU0308 # 10 Y:1990 10 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,139 $1,600 Implemented
KU0308 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $246 $165 Implemented
KU0308 # 08 Y:1990 08 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $106 $0 Implemented
KU0308 # 07 Y:1990 07 1990 INSTALL AUTOMATIC STACK DAMPER $2,280 $3,000 Implemented
KU0308 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $633 $0 Not Implemented
KU0308 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,013 $1,600 Implemented
KU0308 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $665 $80 Implemented
KU0308 # 03 Y:1990 03 1990 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,009 $250 Implemented
KU0308 # 02 Y:1990 02 1990 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,309 $2,500 Implemented