IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0554 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,829 $0 Implemented
KU0554 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,875 $13,000 Not Implemented
KU0554 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,480 $1,810 Not Implemented
KU0554 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,445 $0 Implemented
KU0554 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $620 $2,000 Not Implemented
MO0292 # 08 Y:2000 08 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $6,804 $500 Not Implemented
MO0292 # 06 Y:2000 06 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $800 $0 Implemented
MO0292 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $0 Implemented
MO0292 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,013 $80 Implemented
MO0292 # 07 Y:2000 07 2000 ELIMINATE SHIFT $1,400,000 $2,000,000 Not Implemented
MO0292 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,365 $11,960 Implemented
MO0292 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,842 $339 Implemented
MO0292 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,121 $2,933 Implemented
KU0551 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $827 $700 Not Implemented
KU0551 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $60 Not Implemented
KU0551 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,370 $890 Not Implemented
KU0551 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $26,760 $37,200 Not Implemented
KU0551 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,821 $18,000 Not Implemented
KU0550 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,989 $17,000 Not Implemented
KU0550 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $650 Not Implemented
KU0550 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,038 $20 Not Implemented
KU0550 # 04 Y:2000 04 2000 AUTOMATE FINISHING PROCESS $101,920 $34,000 Not Implemented
KU0550 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,768 $5,000 Not Implemented
MO0295 # 04 Y:2000 04 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,160 $3,700 Not Implemented
KU0549 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $2,352 $150 Not Implemented