Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 2000 |
Principal Product | Automative Magnesium Die Casting |
NAICS | n/a |
SIC | 3361 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 7,500,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $196,146 | 7,694,314 | kWh | $0.03 |
Electricity Demand | $92,702 | 1,776 | kW-months/year | $52.20 |
Electricity Fees | $31,369 | - | $ | - |
Natural Gas | $71,283 | 10,861 | MMBtu | $6.56 |
TOTAL ENERGY COSTS | $394,234 | |||
RECOMMENDED SAVINGS* | $1,424,295 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,491 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,121 Cost: $2,933 |
$912 | 31,360 | $209 | 4 | - | - | - | - | - | - |
$912 31,360 kWh |
$209 4 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,365 Cost: $11,960 |
$5,112 | 175,850 | $1,253 | 24 | - | - | - | - | - | - |
$5,112 175,850 kWh |
$1,253 24 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,842 Cost: $339 |
$3,059 | 105,217 | $783 | 15 | - | - | - | - | - | - |
$3,059 105,217 kWh |
$783 15 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,013 Cost: $80 |
$4,021 | 138,335 | $992 | 19 | - | - | - | - | - | - |
$4,021 138,335 kWh |
$992 19 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $350 Cost: - |
$298 | 10,258 | $52 | 1 | - | - | - | - | - | - |
$298 10,258 kWh |
$52 1 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $800 Cost: - |
- | - | - | - | $800 | 800 | - | - | - | - |
- - kWh |
- - kW-months/year |
$800 800 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.452 ELIMINATE SHIFT |
Savings: $1,400,000 Cost: $2,000,000 |
- | - | - | - | - | - | - | - | $1,400,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$1,400,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $6,804 Cost: $500 |
- | - | - | - | - | - | $6,804 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$6,804 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,424,295 Cost: $2,015,812 |
$13,402 | 461,020 | $3,289 | 63 | $800 | 800 | $6,804 | - | $1,400,000 | - | $13,402 461,020 kWh |
$3,289 63 kW-months/year |
$800 800 lb |
$6,804 - $ |
$1,400,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,491 Cost: $15,312 |
$13,402 | 461,020 | $3,289 | 63 | $800 | 800 | - | - | - | - | $13,402 461,020 kWh |
$3,289 63 kW-months/year |
$800 800 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |