IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0280 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,958 $500 Not Implemented
NC0280 # 02 Y:2004 02 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $69,623 $360,000 Not Implemented
NC0280 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $109,628 $121,591 n/a
NC0280 # 04 Y:2004 04 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $24,049 $79,415 n/a
NC0280 # 05 Y:2004 05 2004 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $19,146 $6,453 Not Implemented
NC0280 # 06 Y:2004 06 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,062 $5,600 Not Implemented
NC0280 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,201 $700 Implemented
NC0280 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,341 $2,060 Not Implemented
NC0280 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $745 $686 Not Implemented
NC0229 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $51,728 $50,000 Implemented
NC0229 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,158 $15,000 Implemented
NC0229 # 03 Y:2002 03 2002 KEEP EQUIPMENT CLEAN $21,155 $1,000 Implemented
NC0229 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $5,620 $1,577 Not Implemented
NC0229 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,444 $6,536 Not Implemented
NC0229 # 06 Y:2002 06 2002 DEVELOP A REPAIR/REPLACE POLICY $2,372 $2,996 Implemented
NC0229 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $298 $860 Not Implemented
NC0229 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $260 $300 Implemented
NC0186 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,878 $20 Not Implemented
NC0186 # 02 Y:2000 02 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,993 $6,400 Not Implemented
NC0186 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $9,327 $32,175 Not Implemented
NC0186 # 04 Y:2000 04 2000 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,321 $4,000 Implemented
NC0186 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,150 $200 Not Implemented
NC0185 # 01 Y:2000 01 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $637 $800 Implemented
NC0185 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $537 $1,700 Not Implemented
NC0185 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $441 $500 Implemented