IAC logo
IAC Assessment: NC0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product mica, clay, and sand
NAICS n/a
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 75,000
Annual Production 150,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $547,068 20,394,246 kWh $0.03
Electricity Demand $420,027 44,103 kW-months/year $9.52
Electricity Fees $18,470 - $ -
Natural Gas $868,906 117,815 MMBtu $7.38
TOTAL ENERGY COSTS $1,854,471
RECOMMENDED SAVINGS* $143,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $130,673
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$51,728
Cost:
$50,000
- - - - $51,728 6,911 - - -
-
kWh
-
-
kW-months/year
$51,728
6,911
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$55,158
Cost:
$15,000
- - - - $55,158 7,296 - - -
-
kWh
-
-
kW-months/year
$55,158
7,296
MMBtu
-
-
$
03: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$21,155
Cost:
$1,000
- - - - $21,155 4,250 - - -
-
kWh
-
-
kW-months/year
$21,155
4,250
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,620
Cost:
$1,577
- - - - $5,620 775 - - -
-
kWh
-
-
kW-months/year
$5,620
775
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,444
Cost:
$6,536
- - - - $6,444 890 - - -
-
kWh
-
-
kW-months/year
$6,444
890
MMBtu
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,372
Cost:
$2,996
$1,584 58,433 $788 84 - - - - $1,584
58,433
kWh
$788
84
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$298
Cost:
$860
- - - - $298 57 - - -
-
kWh
-
-
kW-months/year
$298
57
MMBtu
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$260
Cost:
$300
$81 3,066 $79 8 - - $100 - $81
3,066
kWh
$79
8
kW-months/year
-
-
MMBtu
$100
-
$
TOTAL RECOMMENDED Savings:
$143,035
Cost:
$78,269
$1,665 61,499 $867 92 $140,403 20,179 $100 - $1,665
61,499
kWh
$867
92
kW-months/year
$140,403
20,179
MMBtu
$100
-
$
TOTAL IMPLEMENTED Savings:
$130,673
Cost:
$69,296
$1,665 61,499 $867 92 $128,041 18,457 $100 - $1,665
61,499
kWh
$867
92
kW-months/year
$128,041
18,457
MMBtu
$100
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost