IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0105 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,194 $1,520 Not Implemented
NC0105 # 05 Y:1996 05 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,174 $11,500 Not Implemented
NC0105 # 06 Y:1996 06 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,508 $3,000 Implemented
NC0105 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,655 $5,125 Not Implemented
NC0105 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,562 $5,464 Not Implemented
NC0105 # 09 Y:1996 09 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $702 $500 Not Implemented
NC0105 # 10 Y:1996 10 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $826 $500 Not Implemented
NC0105 # 11 Y:1996 11 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $225 $200 Not Implemented
TN0591 # 01 Y:1996 01 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $7,095 $21,300 Implemented
TN0591 # 02 Y:1996 02 1996 CONVERT TO ELECTROSTATIC POWDER COATING $3,817 $10,480 Not Implemented
TN0591 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,265 $6,160 Not Implemented
TN0591 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $777 $2,520 Implemented
TN0591 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $1,920 Implemented
TN0591 # 06 Y:1996 06 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $544 $1,365 Implemented
TN0591 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $404 $23 Implemented
TN0591 # 08 Y:1996 08 1996 USE SYNTHETIC LUBRICANT $311 $0 Implemented
TN0591 # 09 Y:1996 09 1996 DISCONNECT BALLASTS $140 $184 Not Implemented
NC0072 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $702 $780 n/a
NC0072 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,164 $96 n/a
NC0072 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,034 $1,678 n/a
NC0072 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $343 $270 n/a
NC0072 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,426 $600 n/a
NC0072 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $2,692 $2,700 n/a
NC0072 # 07 Y:1995 07 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $93,047 $400,000 n/a
NC0072 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $851 $434 n/a