Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0042 # 07 Y:1995 | 07 | 1995 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $462 | $20 | Not Implemented |
OD0042 # 01 Y:1995 | 01 | 1995 | METER WASTE WATER | $32,200 | $717 | Implemented |
OD0042 # 02 Y:1995 | 02 | 1995 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $29,544 | $5,168 | Implemented |
OD0042 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $37,136 | $66,487 | Implemented |
OD0042 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,061 | $3,657 | Implemented |
OD0042 # 05 Y:1995 | 05 | 1995 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,916 | $2,449 | Not Implemented |
OD0042 # 06 Y:1995 | 06 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $2,074 | $1,170 | Not Implemented |
NC0050 # 09 Y:1995 | 09 | 1995 | USE LESS WASTEFUL PACKAGING | $3,717 | $0 | Implemented |
NC0050 # 08 Y:1995 | 08 | 1995 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $678 | $0 | Not Implemented |
NC0050 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $440 | Not Implemented |
NC0050 # 06 Y:1995 | 06 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,114 | $300 | Implemented |
NC0050 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $291 | $1,320 | Implemented |
NC0050 # 04 Y:1995 | 04 | 1995 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $14,172 | $35,000 | Not Implemented |
NC0050 # 03 Y:1995 | 03 | 1995 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,910 | $15,000 | Not Implemented |
NC0050 # 02 Y:1995 | 02 | 1995 | INSULATE BARE EQUIPMENT | $4,041 | $9,817 | Implemented |
NC0050 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,208 | $4,662 | Implemented |
NC0049 # 10 Y:1995 | 10 | 1995 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $10,722 | $2,115 | Not Implemented |
NC0049 # 09 Y:1995 | 09 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,233 | $4,000 | Not Implemented |
NC0049 # 08 Y:1995 | 08 | 1995 | REDUCE GLAZED AREAS IN BUILDINGS | $5,285 | $1,400 | Implemented |
NC0049 # 07 Y:1995 | 07 | 1995 | ADD AREA LIGHTING SWITCHES | $478 | $1,200 | Not Implemented |
NC0049 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,915 | $2,000 | Implemented |
NC0049 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $1,245 | $3,600 | Not Implemented |
NC0049 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,293 | $432 | Not Implemented |
NC0049 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,443 | $8,000 | Not Implemented |
NC0049 # 02 Y:1995 | 02 | 1995 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,275 | $180,000 | Not Implemented |