IAC logo
IAC Assessment: NC0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1995
Principal Product Fiber Optic Cable
NAICS n/a
SIC 3669 - Communications Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 100,000
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $534,154 9,454,279 kWh $0.06
Natural Gas $81,155 18,043 MMBtu $4.50
TOTAL ENERGY COSTS $615,987
RECOMMENDED SAVINGS* $38,811 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,371
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Primary Raw Material Electricity Usage Solid Waste (non-haz) Primary Raw Material
$ kWh $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,208
Cost:
$4,662
$5,208 94,666 - - - - $5,208
94,666
kWh
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,041
Cost:
$9,817
$4,041 73,857 - - - - $4,041
73,857
kWh
-
-
lb
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$8,910
Cost:
$15,000
$8,910 162,075 - - - - $8,910
162,075
kWh
-
-
lb
-
-
$
04: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$14,172
Cost:
$35,000
$14,172 - - - - - $14,172
-
kWh
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$291
Cost:
$1,320
$291 5,275 - - - - $291
5,275
kWh
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,114
Cost:
$300
$1,114 20,223 - - - - $1,114
20,223
kWh
-
-
lb
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$680
Cost:
$440
$680 12,309 - - - - $680
12,309
kWh
-
-
lb
-
-
$
08: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$678
Cost:
-
- - $678 43,750 - - -
-
kWh
$678
43,750
lb
-
-
$
09: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$3,717
Cost:
-
- - - - $3,717 - -
-
kWh
-
-
lb
$3,717
-
$
TOTAL RECOMMENDED Savings:
$38,811
Cost:
$66,539
$34,416 368,405 $678 43,750 $3,717 - $34,416
368,405
kWh
$678
43,750
lb
$3,717
-
$
TOTAL IMPLEMENTED Savings:
$14,371
Cost:
$16,099
$10,654 194,021 - - $3,717 - $10,654
194,021
kWh
-
-
lb
$3,717
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Primary Raw Material Electricity Usage Solid Waste (non-haz) Primary Raw Material