IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0125 # 04 Y:1997 04 1997 INSTALL SKYLIGHTS $7,876 $40,250 Not Implemented
NC0125 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,480 $4,200 Not Implemented
NC0125 # 06 Y:1997 06 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $129,253 $33,480 Implemented
NC0026 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $972 $210 Implemented
NC0026 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,139 $1,646 Implemented
NC0026 # 03 Y:1994 03 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,901 $25,000 Not Implemented
NC0026 # 04 Y:1994 04 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,373 $1,500 Not Implemented
NC0026 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,424 $500 Implemented
NC0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $270 Implemented
NC0019 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,400 $3,500 Not Implemented
NC0019 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $7,853 $0 Not Implemented
NC0019 # 04 Y:1994 04 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,311 $680 Not Implemented
NC0019 # 05 Y:1994 05 1994 REDUCE VENTILATION AIR $17,508 $85,800 Not Implemented
NC0003 # 01 Y:1993 01 1993 USE PHOTOCELL CONTROLS $381 $159 Implemented
NC0003 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $648 $360 Implemented
NC0003 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $300 Implemented
NC0003 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,844 $1,000 Implemented
NC0003 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,594 $6,000 Implemented
NC0003 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,205 $31,000 Not Implemented
NC0003 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $307 $650 Implemented
TN0353 # 01 Y:1988 01 1988 KEEP LAMPS AND REFLECTORS CLEAN $10,650 $47,250 Not Implemented
TN0353 # 02 Y:1988 02 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,083 $19,050 Not Implemented
TN0353 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $1,253 $2,380 Implemented
TN0353 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,936 $780 Implemented
TN0353 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,251 $0 Implemented