IAC logo
IAC Assessment: NC0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1997
Principal Product Engine components
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 185
Plant Area (Sq.Ft.) 120,000
Annual Production 40,000,000 Pounds
Production Hrs. Annual 8,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,268 7,052,755 kWh $0.03
Electricity Demand $226,362 12,329 kW-months/year $18.36
Electricity Fees $20,723 - $ -
Natural Gas $14,138 2,220 MMBtu $6.37
TOTAL ENERGY COSTS $502,331
RECOMMENDED SAVINGS* $206,904 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $129,253
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$34,969
Cost:
$195,000
$14,759 432,884 $20,210 1,101 - - - - - - - - - - - - - - $14,759
432,884
kWh
$20,210
1,101
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,740
Cost:
$1,600
$1,826 40,445 $5,914 322 - - - - - - - - - - - - - - $1,826
40,445
kWh
$5,914
322
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$25,586
Cost:
-
- - $25,586 1,666 - - - - - - - - - - - - - - -
-
kWh
$25,586
1,666
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$7,876
Cost:
$40,250
$1,708 50,117 $6,168 336 - - - - - - - - - - - - - - $1,708
50,117
kWh
$6,168
336
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,480
Cost:
$4,200
- - - - - - $840 57,000 - - $(-500) - - - - - $1,140 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$840
57,000
lb
-
-
$
$(-500)
-
$
-
-
$
-
-
$
$1,140
-
$
06: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$129,253
Cost:
$33,480
- - - - $12,724 1,998 - - $9,072 - - - $103,200 - $4,257 - - - -
-
kWh
-
-
kW-months/year
$12,724
1,998
MMBtu
-
-
lb
$9,072
-
$
-
-
$
$103,200
-
$
$4,257
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$206,904
Cost:
$274,530
$18,293 523,446 $57,878 3,425 $12,724 1,998 $840 57,000 $9,072 - $(-500) - $103,200 - $4,257 - $1,140 - $18,293
523,446
kWh
$57,878
3,425
kW-months/year
$12,724
1,998
MMBtu
$840
57,000
lb
$9,072
-
$
$(-500)
-
$
$103,200
-
$
$4,257
-
$
$1,140
-
$
TOTAL IMPLEMENTED Savings:
$129,253
Cost:
$33,480
- - - - $12,724 1,998 - - $9,072 - - - $103,200 - $4,257 - - - -
-
kWh
-
-
kW-months/year
$12,724
1,998
MMBtu
-
-
lb
$9,072
-
$
-
-
$
$103,200
-
$
$4,257
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product By-product Production