Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0260 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $1,666 | $1,530 | Implemented |
IA0260 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,392 | $0 | Implemented |
IA0260 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $416 | $985 | Not Implemented |
IA0260 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $722 | $50 | Implemented |
IA0260 # 05 Y:2000 | 05 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $7,513 | $14,000 | Implemented |
IA0260 # 06 Y:2000 | 06 | 2000 | MINIMIZE WATER USAGE | $243 | $44 | Implemented |
IA0260 # 07 Y:2000 | 07 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $41,184 | $90,000 | Implemented |
KU0546 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $870 | $740 | Implemented |
KU0546 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,500 | $1,000 | Implemented |
KU0546 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $17,000 | $9,570 | Not Implemented |
KU0546 # 02 Y:2000 | 02 | 2000 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $74,779 | $244,140 | Not Implemented |
KU0546 # 01 Y:2000 | 01 | 2000 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $431,791 | $2,400,000 | Not Implemented |
KU0543 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,020 | $50,000 | Not Implemented |
KU0543 # 01 Y:2000 | 01 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $27,200 | $0 | Implemented |
KU0543 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $430 | $450 | Not Implemented |
KU0543 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $50 | Implemented |
KU0543 # 05 Y:2000 | 05 | 2000 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $420 | $100 | Implemented |
KU0543 # 06 Y:2000 | 06 | 2000 | ELIMINATE A BY-PRODUCT | $7,940 | $9,680 | Not Implemented |
KU0543 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,630 | $8,000 | Not Implemented |
KU0543 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $56,920 | $70,000 | Not Implemented |
IA0252 # 07 Y:2000 | 07 | 2000 | INSTALL OCCUPANCY SENSORS | $488 | $488 | Not Implemented |
IA0252 # 11 Y:2000 | 11 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $2,101 | $2,101 | Not Implemented |
IA0252 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $88,850 | $88,849 | Not Implemented |
IA0252 # 09 Y:2000 | 09 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $617 | $617 | Not Implemented |