IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0039 # 02 Y:2009 02 2009 USE "WASH-LESS" PROCESSING EQUIPMENT $4,000 $0 Implemented
DL0039 # 03 Y:2009 03 2009 ADD AREA LIGHTING SWITCHES $5,647 $3,600 Not Implemented
DL0039 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,511 $263 Not Implemented
DL0039 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $150 Not Implemented
DL0039 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,580 $2,450 Not Implemented
DL0039 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,500 $4,700 Not Implemented
LE0234 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $190,924 $500,000 Implemented
LE0234 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $46,545 $3,000 Implemented
LE0234 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $21,102 $32,700 Not Implemented
LE0234 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,567 $1,250 Not Implemented
LE0234 # 05 Y:2006 05 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,090 $6,000 Implemented
LE0234 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $5,320 $1,500 Implemented
LE0234 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,195 $3,490 Implemented
LE0234 # 08 Y:2006 08 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $593 $60 Implemented
LE0228 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,075 $41,200 Not Implemented
LE0228 # 02 Y:2006 02 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,308 $620 Implemented
LE0228 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $3,963 $1,250 Implemented
LE0228 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,427 $2,500 Implemented
LE0228 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,503 $100 Implemented
LE0228 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $1,700 Implemented
LE0228 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $750 Not Implemented
LE0228 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,856 $43,904 Not Implemented
LE0210 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,350 $6,560 Not Implemented
LE0210 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 Implemented
LE0210 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 Implemented