IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

346

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0138 # 03 Y:1992 03 1992 IMPROVE LUBRICATION PRACTICES $1,884 $800 Not Implemented
RU0138 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $803 $36,020 Implemented
RU0138 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,600 $2,500 Not Implemented
RU0131 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,853 $0 Not Implemented
RU0131 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,417 $46,695 Not Implemented
RU0131 # 03 Y:1991 03 1991 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $18,330 $0 Not Implemented
RU0127 # 01 Y:1991 01 1991 ISOLATE HOT OR COLD EQUIPMENT $2,985 $1,200 Implemented
RU0127 # 02 Y:1991 02 1991 ISOLATE HOT OR COLD EQUIPMENT $1,965 $450 Implemented
RU0127 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,708 $0 Implemented
RU0127 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,366 $830 Implemented
RU0128 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,552 $0 Implemented
RU0128 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $42 Implemented
RU0128 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,753 $800 Implemented
RU0128 # 04 Y:1991 04 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,320 $0 Implemented
RU0128 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $630 $169 Implemented
RU0128 # 06 Y:1991 06 1991 USE OPTIMUM TEMPERATURE $4,975 $6,700 Implemented
RU0117 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,153 $0 Implemented
RU0117 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,912 $518 Implemented
RU0117 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,681 $700 Implemented
RU0117 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $827 $200 Implemented
RU0117 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $552 $135 Implemented
RU0082 # 01 Y:1990 01 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,625 $0 Not Implemented
RU0082 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,107 $72 Not Implemented
RU0082 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,184 $0 Not Implemented
RU0082 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,942 $14,350 Not Implemented